A patio, with a plan.
Work out slabs, cut edges and the material volumes underneath. Start with one rectangular area and a straight laying pattern.
2. Your plan
Example estimate
Layout sketch · not an installation drawing
Your materials
What’s behind your estimate?
How we count slabs
We lay out actual slab widths with the entered joints, counting each whole or cut position as one purchased slab. We then add your extra percentage and round up. Offcuts are not reused, so the count can exceed an area-only estimate.
If a trailing joint would leave no usable final piece, cuts are balanced across that direction. The layout is a material estimate, not a drainage or installation design.
How we estimate the layers
Volume = patio area × layer depth. Sub-base is a compacted volume; ask the supplier how much loose material will achieve it. Mortar volume is the complete bedding mix, not a bag count. Primer and jointing compound have separate product-specific coverage.
Worked example
A 4 × 3 m patio with 600 × 600 mm slabs and 5 mm joints has 7 columns and 5 rows: 35 slab positions. With 10% extra, order 39 slabs. A 100 mm sub-base occupies 1.2 m³; a 30 mm mortar bed occupies 0.36 m³.
Supplier guidance
Marshalls paving technical information — a supplier reference, not a product endorsement.
Use the instructions for the particular slab range. Joint widths, bedding, priming and drainage requirements differ.